01
Approve the equipment layout
Confirm bin feeding direction, silo positions, control room, discharge access and maintenance clearances.
02
Prepare ground works and drainage
Complete foundations or the specified support surface and provide drainage suitable for site conditions.
03
Arrange power, water and compressed air
Check voltage, frequency, cable routing, water supply and any external air requirements.
04
Coordinate unloading and lifting
Prepare cranes, forklifts, access roads, installation personnel and a safe storage area for components.

