01
Understand what foundation-free means
It can reduce extensive concrete foundations, but it does not remove the need for ground assessment, leveling and anchoring decisions.
02
Check site bearing conditions
The local project team should confirm ground capacity, drainage, wind conditions and applicable requirements.
03
Plan utilities and vehicle access
Power, water, loader paths, mixer-truck access and material delivery remain part of site preparation.
04
Consider future relocation
Modular support structures can be useful when the plant may move to another project after completion.

