01
Start with peak concrete demand
Estimate the highest volume required during a normal placement period, then compare it with average daily demand.
02
Allow for real operating conditions
Material loading, recipe changes, cleaning and truck positioning can reduce practical output compared with a nominal rating.
03
Match the mixer and feeding system
Mixer size, aggregate feeding method and discharge cycle should work together as one production system.
04
Plan for growth without oversizing
Choose reasonable reserve capacity when future demand is supported by a clear production plan.