1. Pre-installation review
The equipment list and preliminary layout are checked against the site. Foundation requirements, access for lifting equipment, power, water, drainage and aggregate delivery routes should be prepared in advance.

Project support
Installation planning should begin before the equipment reaches the site. Clear responsibilities, prepared foundations and utilities, and an agreed commissioning sequence help reduce avoidable delays.
The equipment list and preliminary layout are checked against the site. Foundation requirements, access for lifting equipment, power, water, drainage and aggregate delivery routes should be prepared in advance.
Structural modules, aggregate bins, conveyor or skip system, mixer, weighing equipment, silos and control components are assembled in the planned sequence. Local lifting and installation resources should be confirmed before arrival.
Before trial production, the team checks wiring, motor direction, pneumatic components, limit switches, weighing signals and safety interlocks. Dry tests are followed by material tests and calibration.
Operators should understand daily start-up and shutdown, recipe control, lubrication, cleaning, inspection points and basic fault reporting. The exact support scope is confirmed for each destination and project.